ABOUT US | MEMBERSHIP/CONTRIBUTIONS | EVENTS | TICKETS/HOURS | CONTACT US | LINKS | SITE MAP  

  HOME



             Home > Construction Journal > April 2001

April 2001

April 5.
The permanent roof is being installed.

April 13.
The external siding has been installed on the old west tower (upon which the Webcam is mounted). The backside of the siding is blocking the lower portion of the image. Glass is being installed in the tower.

April 24.
The long arm in this image is a "concrete pumper." Concrete is being pumped into the tower where it is being directed onto the main stairway forms.







Press Room
Volunteer
Scouts and Camps
Science Programs
Laboratories and Exhibits
Theaters