January 2001

January 2.
The plastic covering around the Digital Dome wall has been taken down. The interior cement block wall for the Digital Dome Theater has been completed and is being covered with dark blue tile.

January 2.
The wooden forms for the roof have been installed, and the exterior wall on the east side of the building is going up.

January 3.
One day later, the exterior walls are complete. Snow is being removed from the roof.

January 4.
Scaffold for building the exterior Digital Dome Theater walls has been erected.

January 8.
The walls on the west side are being installed. (This level is where the mechanical equipment will be located.)