November 8
The metal sheeting for the elevator/stairway tower roof was put into place. During the first week of November, concrete for the Lower Level east side wall (not visible in this image) was poured.

November 11
Installation of the framework for the seating in the Digital Dome Theater was started.

November 20
The concrete for the Lower Level wall has cured, so the remaining steel along the east side of the building is being installed.

November 22
A scaffold is being erected around the Digital Dome Theater for the construction of walls. (And, what with the frigid temperatures we've been experiencing, the faster the entire building is enclosed the happier our construction workers will be!)

November 27
The metal sheeting for the floor and ceiling of the mechanical room level was added. (The new office level is directly below this mechanical level.)